NEW Welcome to Aquafarer
Sign In

Factory

Factory & Manufacturing

12,000 m2 of integrated manufacturing — from raw material to finished boat

As a factory brand of **Qingdao Vatrad Group Co., Ltd.**, Aquafarer controls every stage of production — from the arrival of raw PVC and fiberglass materials to the final pre-delivery inspection of the finished boat. Our manufacturing facility in the Qingdao Economic Development Zone spans 12,000 square metres and houses dedicated workshops for PVC cutting, tube heat sealing, fiberglass RIB hull production, SUP digital printing, final assembly, and quality testing. By integrating design, engineering, prototyping, manufacturing, and testing under one roof, we eliminate the inefficiencies of contract manufacturing and maintain direct control over build quality, material selection, and delivery timelines. Every boat that leaves our workshop is built by our people, on our equipment, to our standards.
12,000 m2 Manufacturing floor
200+ Skilled workers
15,000+ Boats produced annually
Quality certified
Factory Intelligence

Explore Our Manufacturing Capabilities

C

Production Capacity

12,000 m² facility producing 15,000+ boats/yr across SUP (8,000+), RIB (2,000+), inflatable dinghy (5,000+), and safety equipment lines. 200+ workers, 2 shifts.

MOQ: SUP: 5–10 / RIB: 2–5
Lead Time: 30–45 days
Full capacity details →
Q

Quality Lab & Testing

Independent QC lab with 4 testing stages: raw material inspection (tensile, tear, UV), 48h pressure hold at 1.25x rated pressure, seam peel testing, and load/balance verification on every boat.

Lab Equipment: Tensile tester, temp chamber, leak tank
Standards: ISO 9001, CE, AS 1799
Lab procedures & equipment →
O

OEM/ODM Capability

End-to-end OEM/ODM services: custom mould design, private-label packaging, custom tube colors, deck graphics (digital & screen printing), Hypalon upgrade option, and drop-ship logistics.

Certifications: ISO 9001, BSCI, CE, REACH
Shipping: FOB, CIF, DDP to 50+ countries
Full OEM services →
Workshops

Manufacturing Workshops

PVC Cutting & Material Preparation

PVC Cutting & Material Preparation

Automatic CNC cutting machines process PVC, Hypalon, and drop-stitch fabrics with sub-millimetre precision. Computer-optimised nesting minimises material waste and ensures every panel meets its dimensional specification before welding.

Tube Welding & Heat Sealing

Tube Welding & Heat Sealing

Dedicated welding workshop with heat sealing machines and RF dielectric presses. Hot-air heat sealers bond and fuse PVC tube chambers, while RF welds produce high-strength airtight seams that exceed requirements.

RIB Hull Production — Fiberglass

RIB Hull Production — Fiberglass

RIB boat hulls are produced using hand-lay-up fiberglass moulding with polyester and vinylester resin systems. Each layer is hand-rolled and vacuum-bagged for consistent quality. Gelcoat spray booth provides a high-gloss, UV-resistant marine finish.

SUP Printing & Decoration

SUP Printing & Decoration

SUP boards are decorated using digital printing for full-colour graphics and screen printing for logos and repeating patterns. Digital printers produce photo-quality deck designs, while screen printing delivers durable, vivid brand marks.

Final Assembly & Rigging

Final Assembly & Rigging

Assembly line where fiberglass hulls and PVC tubes are mated, engines are mounted, steering and controls are connected, and electrical systems are wired. Each boat follows a 100-point assembly checklist signed off by the team lead.

Quality Testing & Inspection

Quality Testing & Inspection

Every completed boat undergoes mandatory air-retention testing, seam peel verification, and a full systems check before shipping. Our quality lab operates independently from production and reports directly to management.

Equipment

Key Manufacturing Equipment

Automatic PVC Cutting Machine CNC-controlled, 0.1 mm accuracy
Heat Sealing Machine Hot-air, 200°C–600 °C, for tube bonding
RF Dielectric Welding Press 15 kW, airtight seam welding
Fiberglass Hand-Lay-Up Moulds RIB hulls up to 6 m
Digital Printer Full-colour SUP deck graphics
Screen Printing Machine Multi-colour logo printing
Quality Control

Testing & Quality Assurance Process

Every boat undergoes mandatory testing before shipping. Our quality lab operates independently from production and reports directly to management.

1

Raw Material Inspection

PVC, Hypalon, and drop-stitch fabrics undergo tensile testing (), tear propagation, and UV resistance verification before any batch enters production.

2

48-Hour Air Retention Test

Every tube chamber is inflated to 125% of rated pressure and held for 48 hours. Pressure drop below 5% triggers automatic rejection and seam re-inspection.

3

Load & Balance Testing

Completed boats are loaded to maximum rated capacity and tested for stability, freeboard, and handling. Each vessel is water-tested before final inspection.

Production Flow

From Material to Finished Boat

Every boat passes through 6 production stages with QC checkpoints at every step. No shortcuts, no skipped inspections.

01

Material Receiving & Incoming QC

All incoming materials are logged by batch/lot number in our ERP system. PVC fabric rolls, drop-stitch cores, valves, adhesives, and hardware are quarantined until QC sign-off.

QC Check

Tensile strength (ASTM D751), tear resistance (ISO 4674), thickness gauge, adhesive viscosity, visual defect scan

Reject Threshold

100% of batches tested. Reject if tensile < 90% of spec, tear < spec min, or any visual defect

Responsibility: Incoming QC team (3 inspectors)

02

CNC Cutting & Material Prep

Computer-optimized nesting lays out panels on PVC stock to minimize waste. Automatic CNC cutting machines maintain 0.1 mm positional accuracy.

QC Check

Dimensional check against CAD DXF files, edge quality inspection, panel count verification

Reject Threshold

Every 20th panel measured. Tolerance ±0.5 mm. Reject batch if >2% out of tolerance

Responsibility: Cutting workshop lead

03

Welding & Drop-Stitch Bonding

Drop-stitch cores are bonded to outer PVC laminates using heat lamination. Tube chambers are RF-welded or hot-air welded. Rail bands are triple-layer fusion bonded.

QC Check

Peel test every 50 units (ASTM D751), weld width measurement, hot-air temperature log review, visual seam inspection under backlight

Reject Threshold

Peel strength min 8 N/cm. Weld width tolerance ±1 mm. Any visible channeling = reject

Responsibility: Welding QC (2 inspectors per shift)

04

Assembly & Rigging

Boats move to final assembly where all components are mated: hull + tubes, valves installed, D-rings, handles, fin boxes, and carry bag fitting. Each unit follows a 100-point assembly checklist.

QC Check

100-point checklist sign-off per unit, valve function test (10 open/close cycles), hardware torque verification, visual inspection

Reject Threshold

Zero-defect policy on safety-critical items (valves, D-rings, handles). Minor cosmetic: AQL 2.5 (ISO 2859)

Responsibility: Assembly team lead + line QC

05

Pressure Testing & Quality Hold

Every chamber is inflated to 1.25× rated pressure (typically 20–25 PSI) and held for 24–48 hours. Pressure sensors log continuously. Chambers exceeding 5% pressure drop are rejected and sent for seam re-inspection.

QC Check

24h pressure hold log, sensor calibration verified daily, temperature-compensated pressure reading, seam re-test after repair

Reject Threshold

Max 5% pressure drop over 24h at stable temp. Any chamber exceeding this = 100% re-test of entire production batch

Responsibility: Quality lab (independent of production, reports to management)

06

Final Inspection & Packing

Final visual and functional inspection. Surface defects, color consistency, label/BIN verification, packaging integrity, and accessory completeness. Units are vacuum-packed, boxed, and palletized for container loading.

QC Check

Full visual inspection, accessory checklist per SKU, packaging drop test (1 m, random sample), label/bar code scan verification

Reject Threshold

AQL 2.5 for major defects, AQL 4.0 for minor. Zero tolerance on safety defects. 100% of units visually inspected

Responsibility: Final QC team (4 inspectors) + Packing team lead

Our People

Workforce & Departments

Engineers across R&D, mold design, materials lab, and production engineering. Average 7+ years in inflatable manufacturing.

2 shifts/day (07:00–15:30, 15:30–00:00). Optional night shift for urgent orders.

Monthly QC training, quarterly safety drills, annual skills assessment. New hires complete 40-hour induction before working on production line.

25+ R&D & Engineering Product design, mold engineering, materials lab
15 Cutting & Material Prep CNC cutting, panel preparation, material handling
40 Welding & Lamination RF welding, hot-air welding, drop-stitch bonding
30 RIB Hull (FRP) Fiberglass lay-up, gelcoat, vacuum bagging
35 Assembly & Rigging Final assembly, hardware installation, systems check
12 Quality Control Incoming QC, in-process QC, final inspection, lab testing
20 Logistics & Packing Packaging, container loading, export documentation
15 Management & Admin Sales, procurement, HR, finance, compliance
Traceability

Material Tracking & Batch Control

Every batch of raw material is assigned a unique lot number in our ERP system. From arrival through production to the finished product, each boat's bill of materials links back to the original supplier batch. This enables full upstream traceability for any quality or compliance inquiry.

System: Custom ERP (Qingdao Vatrad Group internal system) + physical batch tags on each work order

Coverage: 100% of production materials — PVC, Hypalon, drop-stitch fabric, adhesives, valves, hardware, packaging

Records retained: 10 years (per CE 2013/53/EU requirement)

Material Source Certification
Marine-grade PVC Chinese and Korean suppliers ISO 9001, REACH, RoHS
Hypalon (CSM) Japanese supplier ISO 9001, REACH
Drop-stitch fabric In-house weaving + external partner Internal QC + supplier ISO 9001
Valves & Hardware Chinese OEM suppliers ISO 9001, material certs per batch
QC by the Numbers

Quality Control Metrics

Real pass/fail data from our production line. Our quality lab operates independently from production and reports directly to management.

100% Units pressure-tested Every boat, every chamber, every batch
<5% Max allowable pressure drop Over 24h at 1.25× rated pressure
AQL 2.5 Major defect threshold Per ISO 2859 sampling standard
24–48h Pressure hold duration Depending on product category
1.25× Test pressure vs rated Safety margin on every chamber
0% Tolerance on safety defects Valves, D-rings, seams, buoyancy
OEM Projects

Brand & OEM Partnership Case Studies

From concept to container — how we help global brands launch and scale their inflatable watercraft lines.

Challenge

European outdoor retailer needed a private-label SUP line with unique deck graphics, eco-friendly PVC, and retail-ready packaging — all delivered in 60 days.

Solution

Developed custom digital print files, sourced REACH-compliant PVC, and compressed sampling from 3 rounds to 1 by co-locating the design team at our Qingdao factory.

Result

55 days from signed PO to FOB. 2,400 units across 4 SKUs. Repeat order placed before first container arrived.

Challenge

US watersports startup needed a high-performance drop-stitch kayak with custom hull shape, co-branded packaging, and BSCI certification for retail placement.

Solution

Adapted existing drop-stitch kayak mould with modified rocker profile, developed co-branded packaging artwork, and provided full BSCI audit documentation.

Result

Successfully listed in 3 major US outdoor chains. 5,000+ units in first year with 98% sell-through rate.

Challenge

Australian distributor required a CE-certified RIB range with custom tube colours, Hypalon upgrade option, and compliance with Australian Standard AS 1799.

Solution

Produced pre-production samples with 4 tube colour variants, sourced CSM Hypalon from Japanese supplier, and coordinated third-party AS 1799 compliance testing.

Result

3-model RIB range launched in AU/NZ market. Followed by government tender win for 12 patrol RIBs.

FAQ

B2B & OEM Frequently Asked Questions

What is the minimum order quantity (MOQ) for OEM inflatable SUP boards?

MOQ starts at 5–10 units for standard OEM models. Custom moulds and private-label projects require a minimum of 200 units depending on complexity. Trial orders and sample runs are available for new brand launches.

Does Aquafarer hold BSCI certification?

Yes. Our factory maintains valid BSCI social compliance certification (audit report available on request). We also hold for quality management and all products carry CE certification. REACH and RoHS compliance documentation provided with every OEM shipment.

What is the typical lead time for an OEM order?

Standard lead time is 30–45 days from confirmed PO and deposit. Custom mould development adds 15–20 days for tooling. We offer expedited production for urgent orders and seasonal rushes during the pre-summer window (Jan–Mar).

Can you ship FOB Qingdao or CIF to our port?

Yes. We ship FOB Qingdao, CIF major global ports, and DDP for qualified partners. Our logistics team manages container booking, export documentation, and customs clearance. We ship to 50+ countries across EU, US, AU, and Asia markets.

See our manufacturing process

Follow a boat through every stage of production — from raw material to sea-ready craft.

View production process → →

Start your OEM/ODM project

Contact our manufacturing team to discuss your product requirements, MOQ, lead time, and pricing.