End-to-End OEM Process
From Design Brief to Container Loading

عملية إنتاج متكاملة للقوارب القابلة للنفخ. شهادة CE، ISO 9001، FOB تشينغداو.

Step by Step

6-Step OEM/ODM Workflow

01

Specification & Design Brief

Share target specs, CAD drawings, or reference product. Engineering reviews materials and compliance before quoting.

Timeframe: 1-3 business days
Deliverable: Feasibility report & quotation
02

3D Mold Prototyping

CNC-machine custom molds. Prototype samples within 7–20 working days.

Timeframe: 7–20 working days
Deliverable: Prototype sample unit
03

Material Selection & Sample

Military-grade PVC, Hypalon CSM, or drop-stitch core. Pre-production samples with your branding.

Timeframe: 15–20 working days
Deliverable: Branded pre-production sample
04

CE Factory Audit & Compliance

CE declaration, ISO 9001 traceability, BSCI report, REACH declarations.

Timeframe: Concurrent with production
Deliverable: Full compliance documentation
05

Bulk Production & Inline QC

100-point quality checklist. 24-hour pressure retention, seam peel, visual inspection per unit.

Timeframe: 30–45 days
Deliverable: QC report per batch
06

FOB Qingdao Logistics & Shipping

Palletised, shrink-wrapped, container-loaded. Full export documentation and shipment tracking.

Timeframe: 7-14 days
Deliverable: Bill of lading & tracking
Quality Gates

Inline QC Checkpoints

Material inspection

Incoming fabric, PVC, Hypalon batch-tested before cutting

Weld/seal integrity

High-frequency welds tested for peel strength and airtightness

24-hour pressure retention

Every unit inflated to rated PSI, held 24 hours, zero loss tolerance

Visual inspection

Logo alignment, colour accuracy, seam finish, accessory mounting

Weight verification

Finished weight within +/- 5% of specification

Packaging audit

Branded packaging completeness, manual inclusion, accessory kit check

FAQ

What is the typical OEM lead time?

Standard: 30–45 days. Custom RIB: 45–60 days. Custom mold: 45–90 days. Sample: 15–20 working days.

Can I visit the factory during production?

Yes. Factory visits welcome at any stage. Virtual tours also available via video call.

What happens if a unit fails QC?

Quarantined, root-cause analysed, reworked or scrapped. Batch failure triggers production hold and corrective action.

Do you provide production progress updates?

Weekly reports with photos, QC stats, completion percentage. Critical milestones reported within 24 hours.

هل أنت مستعد لبدء مشروع OEM الخاص بك؟

أرسل متطلباتك. سنرد بعرض أسعار مفصل ووقت تسليم خلال 24 ساعة.

Standard lead time 30–45 days. FOB Qingdao.